Kodiak Shield Roofing
Finished Barkwood shingles along a roof hip in Richboro, with the chimney beyond the roof slope
Completed Project

Richboro, PA Roof Replacement

Kodiak replaced this Richboro roof in one day with GAF Timberline HDZ shingles in Barkwood. See the roof during tear-off and how the finished roof meets the chimney and eaves.

Location
Richboro, Pennsylvania
Service
Full roof replacement
Completed
The Case Study

From the roof report to the finished roof

The roof report measured 2,234 square feet across 11 roof sections at this Richboro home. Most of the roof had a 5/12 pitch, and the report also identified a lower-slope area. The job photos show the replacement up close, where the roof meets the chimney and where the shingle slopes come together.

The roof after tear-off

The crew removed the old shingles down to the wood deck. The progress photo shows the bare wood and the edge of the roof before the new shingles went on.

Exposed wood roof deck after the old shingles were removed
The exposed deck during tear-off.

A path for water around the chimney

As part of the replacement, the crew built a small peak called a cricket on the uphill side of the chimney. It guides rain and snowmelt around the masonry. The finished photo shows the peak below the V in the white flashing.

Shingled cricket and V-shaped white flashing at the uphill base of the chimney
The finished cricket and flashing behind the chimney.

The finished Barkwood shingles

The finished views show the warm brown blend of the Barkwood shingles across the adjoining slopes. Where two slopes meet at an outside corner, matching cap shingles run along the hip. A second view shows the shingle courses down to the eave.

Two finished Barkwood shingle slopes meeting along a capped hip
The capped hip where two shingle slopes meet.
Measurements From The Roof Report

The Roof, In Numbers

The report models a 12% allowance for cuts and waste. The proposal lists 68 bundles. Both figures are for planning.

Measured roof dimensions
Roof surface area2,234 sq ft
Roof planes11
Predominant pitch5/12 — 5 inches of rise per 12 inches of run
Eaves262 linear ft
Ridges / hips23 / 143 linear ft
Material planning from the roof report and proposal
Modeled roof area with 12% waste allowance~2,502 sq ft
Modeled shingle quantity at 12%~67 bundles
Shingle quantity in the proposal68 bundles (quoted)
For Your Own Roof Quote

Walk through the quote section by section

Ask your contractor to show you which areas the quote covers on the roof report. If the house has a flatter section or a chimney, ask how the roofing will change there and what work is included where those areas meet the main slopes.

Planning a roof replacement in the same area?

Roof replacement in Bucks County, PA
From The Job

More photographs from the project.

Small wood peak being built uphill of the Richboro chimney beside exposed roof decking
The wood peak of the cricket takes shape behind the chimney.
New Barkwood shingles seen along the edge of the finished Richboro roof
A roof-level view along the finished eave.

Planning your own roof replacement? Roof replacement in Bucks County, PA

Your Roof

Define The Scope Before You Commit

Start with documented measurements and a replacement scope you can review before work begins.